Customization: | Available |
---|---|
Certification: | ISO |
Application: | Steel Structure Walkway, Foot Pedal, Drain Cover |
Still deciding? Get samples of US$ 1.5/Piece
Request Sample
|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Product introduction
The installation clip of steel grid plate is made of high quality steel plate after the machine is bent and punched, the installation clip is firm and durable, easy to install, the installation clip after galvanizing is beautiful and firm, and not easy to rust, which can fix the steel grid plate well.
Technical Data
Galavnized Clip
Cross Bar Pitch | Bearing Bar Pitch | Bearing Bar Specification Width Thickness | |||||
20x3 | 25x3 | 32x3 | 40x3 | 20x5 | 25x5 | ||
30 | 100 | G203/30/100 | G253/30/100 | G323/30/100 | G403/30/100 | G205/30/100 | G255/30/100 |
50 | G203/30/50 | G253/30/50 | G323/30/50 | G403/30/50 | G205/30/50 | G255/30/50 | |
40 | 100 | G203/40/100 | G253/40/100 | G323/40/100 | G403/40/100 | G205/40/100 | G255/40/100 |
50 | G203/40/50 | G253/40/50 | G323/40/50 | G403/40/50 | G205/40/50 | G255/40/50 | |
Cross Bar Pitch | Bearing Bar Pitch | Bearing Bar Specification Width Thickness | |||||
30 | 100 | G325/30/100 | G253/30/100 | G323/30/100 | G403/30/100 | G205/30/100 | G255/30/100 |
50 | G325/30/50 | G253/30/50 | G323/30/50 | G403/30/50 | G205/30/50 | G255/30/50 | |
40 | 100 | G325/40/100 | G235/40/100 | G323/40/100 | G403/40/100 | G205/40/100 | G255/40/100 |
50 | G325/40/50 | G253/40/50 | G323/40/50 | G403/40/50 | G205/40/50 | G255/40/50 |
Type classification
Type A: It consists of an upper press plate with double hooks, A lower press plate with teeth and an M8 inner hexagon bolt.
Type B: consists of an upper pressure plate with two hooks (one hook can enclose two adjacent steel lattices), a lower pressure plate with teeth and a & GT;Composition of M8 inner Angle bolts.
Type C: consists of an upper pressure plate with a double hook and an M8 hex head bolt that can be welded to the support member.
Nstallation method
1. Directly weld the steel grid plate or step plate on the supporting steel structure, and brush the welding place with zinc silver powder paint twice.
2, the use of the Yangtze River Delta steel grid special installation clip installation, do not destroy the galvanized layer, easy to disassemble.Each set of mounting clamps includes an upper clamp, a lower clamp, an M8 round head bolt and a nut.
3. Stainless steel mounting clip or bolt connection and other fastening methods can be provided as required.
4, the steel grid installation clearance is generally 10MM.
5, the installation must pay attention to the installation is firm and reliable, should often check, prevent the installation clip loose fall off, close to the vibration source of the steel grid plate welding or add rubber pad.
Product certification
Application